Plan 3 of 6

3 bedroom, 2 bath: 1,536 sq ft

by Joe Miller

A simple one-story house, 48 × 32 ft, with a wood stove in the living room. Priced two ways: tied to town water, sewer and power, or fully off grid with its own well, well house, septic system and solar power.

Living space1,536 sq ft
Size48 × 32 ft
Bedrooms / baths3 / 2
HeatWood stove
Without off-grid package
$200,000 - $386,500

House plus town water, sewer and power hookups, with 10% contingency.

With off-grid package
$250,200 - $482,300

House plus well, well house, septic and solar, with 10% contingency.

Basement option: add about $72,700 - $129,800 to either price for a full 1,536 sq ft basement with storm shelter and Dutch drain. See the basement option.

At a glanceFloor planSite planHow it goes togetherWaterFooting drainSepticSolarWood stoveBasement optionCostMaterialsBlueprintSources

At a glance

ItemPlan
Size48 × 32 ft one-story house, 1,536 sq ft, plus a 20 × 6 ft covered front porch
Rooms3 bedrooms, 2 baths, living room, kitchen and dining, laundry
FoundationConcrete slab on footings with a footing (Dutch) drain piped downhill to daylight. Option: a full basement with a storm shelter and its own Dutch drain
Walls2x6 framed walls with R-21 insulation; board-and-batten, lap or log siding
Roof6/12 metal roof on trusses, R-49 attic insulation
Heat and coolingWood stove in the living room (main heat, works with no power); 2 ductless mini-splits for cooling
WaterOff grid: drilled well, well house with storage tank and pressure tank. On grid: town water.
SewerOff grid: 1,000-gallon septic tank and drain field. On grid: town sewer.
PowerOff grid: 8.8 kW solar, about 31 kWh of batteries, 1 inverter, equipment shed. On grid: utility power.
Cooking and hot waterPropane range and tankless water heater (keeps the solar system smaller)
Important: these are planning drawings to choose a layout and price the job. Before building, have a designer or engineer make stamped construction drawings, and use licensed trades for electrical, gas and septic work.

Floor plan

Covered porch 20' × 6'Kitchen & Dining20' × 13'Living Room20' × 19'Primary Bedroom15' × 14'Primary Bath8' × 14'Laundry5' × 14'HallBedroom 211' × 14'Bath 26' × 14'Bedroom 311' × 14'stair if basement48'-0"32'-0"BACKFRONT
Living room and kitchen on one side, bedrooms and baths off a hall on the other. The wood stove sits in the living room. The dashed box is where the basement stair goes if you choose the basement option.
RoomSize (ft)
Kitchen & Dining20 × 13
Living Room20 × 19
Primary Bedroom15 × 14
Primary Bath8 × 14
Laundry5 × 14
Bedroom 211 × 14
Bath 26 × 14
Bedroom 311 × 14
Covered front porch20 × 6

Site plan

Site plan (not to scale): the house with the off-grid packageBlue, green, red and brown items are the off-grid package. Without it, the house connects to town water, sewer and power instead.UPHILLDOWNHILLHouse48 × 32 ft · 3 bed · 2 bathporch (south)Well housewell · storage tank · pressure tankwater line below frostSolar array (panels face south)Equipmentshedburied power linepower to the well pumpseptic tankDrain field, at least 100 ftfrom the well (typical state rule)footing drain to daylightpropane tank(range, water heater)A starting layout only. Final spots are set by the land, the soil test, the well driller and the county health office.

How it goes together, from the ground up

Cross-section: how the house goes together, bottom to topattic insulation R-49 above the ceilingROOMS (9 ft ceilings)Roof: metal panels · synthetic underlayment · 7/16" OSB on trusses 24" apart, 6/12 pitch, 18" overhangs Ceiling: 1/2" drywall (or pine) · R-49 blown insulation above Walls: 2x6 studs 16" apart · R-21 insulation · 7/16" OSB · house wrap · siding (board-and-batten, lap or log siding) · 1/2" drywall inside Floor: 4" concrete slab · 6-mil vapor barrier · 2" foam under the slab edge · 4" gravel Footings: 20" wide × 12" deep, 2 rows #4 rebar, below frost Footing drain: 4" perforated pipe in gravel and fabric, piped to daylight
LayerWhat it is made of
1. Footings20" wide × 12" deep concrete, 2 rows of #4 rebar, below frost depth on firm soil.
2. Footing drain4" perforated pipe in washed gravel wrapped in filter fabric, all around the outside of the footing, sloped to one low corner and piped downhill to daylight.
3. Slab4" gravel, 6-mil vapor barrier, 2" foam at the edges, 4" concrete slab with #4 rebar grid. Plumbing and the water line go in before the pour.
4. Walls2x6 studs 16" apart, R-21 insulation, 7/16" OSB, house wrap, then siding. 1/2" drywall inside. 9 ft ceilings.
5. Inside walls2x4 walls; baths get moisture-resistant drywall or tile backer.
6. RoofEngineered trusses 24" apart, 6/12 pitch, 7/16" OSB, synthetic underlayment, metal panels, 18" overhangs.
7. Ceiling and attic1/2" drywall or pine ceiling; R-49 blown insulation above; soffit and ridge vents.
8. FloorsSealed or stained concrete, or vinyl plank over the slab; tile in the baths.

Order of the build

  1. Permits, and the septic soil test if off grid.
  2. Drill the well and build the well house (water for the job site).
  3. Clear and grade the pad; dig and pour the footings.
  4. Lay the footing drain; rough-in plumbing under the slab; pour the slab.
  5. Frame the walls and set the trusses; sheathe and roof. The house is "dried in."
  6. Windows, outside doors, siding.
  7. Rough plumbing, wiring, wood stove chimney; inspections.
  8. Insulation, drywall, ceilings.
  9. Kitchen, baths, floors, trim, paint.
  10. Hook up water, septic and solar (or town utilities); final inspection; move in.

Water: well and well house

Water: well, well house and housesubmersible pumpWell housestoragetankbooster + pressure tankfilter+ UV1" water line, buried below frost (18-24")Housewaterheaterkitchen, baths, laundryThe pump fills the tank on a float switch; the booster and pressure tank give the house 40-60 psi. The tank still holds water when the power is out.

Footing (Dutch) drain

Footing (Dutch) drain at the slab edgeGround sloped away 6" in the first 10 ftWall on the slab4" slab on vapor barrier and gravelFooting, below frostWashed gravel, wrapped in filter fabric4" perforated pipe, holes down, 1/8" per ft fallThe pipe runs all the way around the footing to thelow corner, then in solid pipe downhill to daylight,away from the septic field. No sump pump needed.

About 160 ft of 4" perforated pipe goes around the footing, plus solid pipe from the low corner downhill to daylight with a critter screen on the end. Gutters run in their own solid pipe, not into the footing drain.

Septic system

Off grid, the house needs its own septic system, downhill from the house and well.

Septic itemEstimated cost
Soil test and design$500 - $1,200
Permit fee$50 - $500 (varies by state)
1,000-gallon concrete tank, set, with risers and effluent filter$1,400 - $2,800
Sewer line, distribution box, drain field$3,000 - $8,000+
Excavation and labor$2,000 - $5,000+
Total$7,000 - $17,000

If the soil test fails, an alternative system (pressure-dosed or drip) can run $10,000 to $25,000 or more.

Solar power

Victron equipment (the same family we run on our own ranch), sized for this house. Propane for cooking, hot water and drying keeps the electric load down; the wood stove does the heating. Summer cooling with the mini-splits adds about half again.

Daily power use (estimate)

UsekWh per day
Well pump1.5
Refrigerator + freezer2.0
Lights (LED)0.8
Internet, TV, computers, phones1.9
Washer, microwave, small appliances1.7
Fans, stove blower, misc.1.0
Total, normal dayabout 12 kWh

Equipment list

PartSizeEstimated cost
Solar panels24 × 365 W, strings of 4 = 8.8 kW, ground mount facing south$2,600 - $4,300
Ground-mount rackingSteel or aluminum, set in concrete, for 24 panels$1,900 - $3,800
Inverter / charger1 × Victron Quattro 24 V system, 120/240 V (with autotransformer on 24 V systems)$4,000 - $5,400
Charge controllers3 × Victron SmartSolar MPPT 250/100$2,600 - $2,900
Batteries6 × 24 V LiFePO4 (about 5.1 kWh each) = about 31 kWh$6,700 - $7,500
MonitoringVictron Cerbo GX + SmartShunt$700 - $900
DC protectionClass T fuse, battery disconnect, cables, busbars$600 - $1,000
Combiner and surge protectionPV breakers, surge protection, ground rods$600 - $1,200
Power linesBuried conduit and wire to the house and the well pump$1,500 - $3,500
Backup generatorPortable into the inverter AC input, or propane standby with auto-start$0 - $7,000
Equipment shed12 × 12 ft insulated shed (spec below)$5,000 - $10,000
ElectricianInstall, connect and set up$7,000 - $12,500
Total$33,200 - $60,100

About 31 kWh of batteries carry roughly 2 days of normal use with no sun; the generator covers long cloudy spells. Keep the array out of the house's winter shadow (60-80 ft away on the south side or in an open field) and away from trees.

Solar equipment shed, 12 × 12 ftBattery rack: 6 batteries1 inverter3 charge ctrlCerbo GX3 ft clearAC panelsteel door4" concrete slab; 2x4 walls, R-15 insulation;5/8" fire-rated drywall inside; metal roof, R-30.Keep it 40-95 °F: thermostat exhaust fan forsummer, small heater for winter (lithiumbatteries must not charge below freezing).Equipment on fire-rated backer board, 3 ftclear space in front. Smoke/heat alarm andABC extinguisher by the door. Combiner withPV breakers and surge protection; ground rod.

Wood stove: the main heat

A high-efficiency wood stove in the living room heats the house with no electricity, and its flat top works as a cooktop when the power is out.

FeatureSpec
Size2.0 to 3.0 cu ft firebox, rated for 1,500-2,200 sq ft
Clean burningEPA certified to the 2020 standard, about 75% efficient or better
Long burnsCatalytic or hybrid, 10 to 30 hours on low
CookingFlat top you can cook and boil water on
InstallStone or tile hearth pad, insulated stainless Class A chimney through the ceiling and roof (3 ft above the roof), outside-air kit, clearances from the maker's manual
SafetySmoke and CO alarms, fire extinguisher, chimney sweep once a year
FirewoodAbout 5 to 7 cords a winter, kept dry
Cost$8,000 - $18,000 installed

The federal tax credit for wood stoves ended for stoves put in after December 31, 2025.

Basement option

Instead of the slab, build the house over a full 1,536 sq ft basement with 9 ft walls. It adds storage, a storm shelter, a workshop and room to grow, and puts the water and power equipment where it stays warm and dry.

Utility Room14' × 13'Storm Shelter14' × 12'Workshop14' × 14'Root Cellar & Pantry10' × 18'STAIRS UPFamily / Rec Roomopen; finish latersteel beam on postsegress windowemergency exit door (walkout, downhill side)48'-0" · 9 ft wallsBACK
Basement under the same house. The stair comes down along the west wall of the living room (dashed on the main floor plan).
RoomSize (ft)
Utility Room14 × 13
Storm Shelter14 × 12
Workshop14 × 14
Root Cellar & Pantry10 × 18
Family / rec roomThe open rest of the basement

Basement stair layout

Stair layout: basement stair (basement option)Side view, drawn to scale. 16 risers, 15 treads. Same layout going up and going down.handrail 34-38" above the tread nosing6 ft 8 in headroom (minimum)36" landing36" landingTotal run 12 ft 6 in (15 treads × 10")Total rise about 10 ft 1 in(9 ft wall + floor framing)MAIN FLOORBASEMENT FLOOR
PartSpec
WhereAlong the west wall of the living room, in a 4 × 13 ft stairwell, with a door at the top to keep basement air out of the house.
Overall riseAbout 10 ft 1 in (9 ft wall plus the floor framing)
Risers16 risers about 7-9/16" tall (code maximum 7-3/4")
Treads15 treads 10" deep plus a 3/4"-1" nosing (code minimum 10")
Overall run12 ft 6 in, plus a 36" landing at the top and the bottom
Width36" clear between the handrail and the wall (code minimum)
Headroom6 ft 8 in clear above the stair all the way down (code minimum)
Handrail34-38" above the tread nosing, on at least one side, continuous top to bottom
Guard36" guard at any open side or landing more than 30" above the floor, balusters under 4" apart
StringersThree 2x12 stringers (or a factory-built stair); treads 5/4 hardwood or 2x pine
LightA light over the stair with a switch at the top and the bottom

Based on the International Residential Code (R311.7) used by most U.S. counties; check your local code.

Dutch drain: keeping the basement dry

Basement option: cross-section with the Dutch drainhillside falls awayBASEMENT, 9 ft wallsexit doorMAIN FLOORsolid pipe from the basement footing draincomes out of the hillside to daylightMain floor: I-joists 16" apart on a steel beam and posts, 3/4" glued subfloor Basement walls: 8" poured concrete with rebar; outside waterproofing membrane + drain board; 2" foam inside Basement floor: 4" slab, vapor barrier, 4" gravel; floor drain Footings: 24" wide × 12" deep, 2 rows #4 rebar, below frost Dutch drain: 4" perforated pipe in washed gravel and filter fabric around the whole footing, falling to one low corner Emergency exit: a steel walkout door at the bottom of the basement on the downhill side; locks from outside, opens from inside with no key.On a slope, the drain runs downhill to daylight by gravity. On flat ground it goes to a sump pit with a pump(and a battery-backup pump), discharging well away from the house and the septic field.

Emergency exit door

Basement option cost

ItemLowHighBasis
Excavation, 9 ft poured walls, footings, basement slab, waterproofing, backfill$43,000$69,100Unfinished basement about $33/sq ft average (HomeGuide)
Dutch drain around the basement footing, piped downhill to daylight (or sump pit + pump with battery backup on flat ground)$5,500$10,700Estimate
Main floor system over the basement: steel beam, posts, I-joists, subfloor$12,300$21,500Estimate
Basement stair, railing, light$2,000$5,000Estimate; see the stair layout
1 egress window with well and ladder$2,500$5,000Required for any basement bedroom; a way out
Storm shelter: reinforced concrete walls and ceiling, steel door$5,000$10,000Estimate; engineer to design
Emergency exit door at the bottom of the basement: insulated steel walkout door, concrete landing and retaining walls (or a bulkhead with steps on a flat lot)$3,500$9,000Estimate
Basic basement wiring, lights, outlets$3,100$6,100Estimate
Less: the slab foundation you no longer need-$10,800-$18,400Credit
Total, added for the basement$66,100$118,000about $43 - $77 per sq ft of basement
Total with 10% contingency$72,700$129,800Add to Option A or B below

Basement materials

MaterialQuantity
Concrete, basement footings (24" × 12")12 cu yd
Concrete, 8" × 9 ft basement walls37 cu yd
Concrete, 4" basement slab20 cu yd
Waterproofing membrane + drain board1,440 sq ft
4" perforated drain pipe + solid pipe to daylight160 ft + 50-150 ft
Washed gravel for the drain and under the slab219 tons
I-joists 11-7/8", 16" apart72
Steel beam + posts48 ft beam, 4 posts

Cost estimate

November 2026 price ranges for hired crews, land not included. Your own labor, used materials, or lumber from your own land can cut this a lot.

The house

ItemLowHighBasis
Site prep, driveway gravel, house pad$5,300$11,600Estimate
Slab foundation: footings, 4" slab, vapor barrier, edge foam$10,800$18,400Estimate
Footing (Dutch) drain around the slab, piped to daylight$3,000$6,300Estimate
Framing: 2x6 walls, roof trusses, OSB sheathing, house wrap$33,800$53,800Estimate
Metal roof and underlayment$8,000$16,000Metal roofs $3.50+/sq ft installed (Fixr)
Windows and outside doors$8,400$16,8009 windows, 2-3 doors
Siding and exterior trim$11,500$21,600Estimate
Insulation (R-21 walls, R-49 attic) and drywall$9,200$15,400Estimate
Plumbing: baths, kitchen, laundry, propane water heater$17,000$29,0002 baths
Electrical wiring, panel, lights (licensed electrician)$9,700$16,800Estimate
Wood stove, chimney, hearth (main heat)$8,000$18,000See the wood stove section
2 ductless mini-splits for cooling and backup heat$8,000$16,000Estimate
Kitchen cabinets, counters, appliances$12,600$30,300Estimate
Bathroom finishes: tile, vanities, showers, toilets$10,000$20,000Estimate
Flooring$7,700$15,400Estimate
Inside doors, trim, paint$7,700$15,400Estimate
Covered front porch$4,200$7,20020 × 6 ft
Plans, engineering, permits$2,500$7,500Estimate
Total, house$177,300$335,400about $115 - $218 per sq ft

Option A: without the off-grid package

ItemLowHighBasis
Town water tap / meter$1,500$5,000Varies a lot by town
Sewer tap$1,500$6,000Varies a lot by town
Electric service from the utility$1,500$5,000Varies with distance to the line
Total, house + town hookups, with 10% contingency$200,000$386,500

Option B: with the off-grid package

ItemLowHighBasis
Drill the well$2,500$9,000$2,500 is what one real well cost; most run $25-$55 per foot drilled
Pump, pressure tank, wiring and controls$2,500$6,000$2,500-$6,000 (welldrillingcosts, 2026)
Well house$2,000$4,000$2,000 is what a real well house cost
Storage tank, float switch, filters, UV light, water line$1,500$3,500Estimate
Septic system: 1,000-gallon tank, drain field, design, permit$7,000$17,000See the septic section
Solar power: 8.8 kW panels, 31 kWh batteries, equipment shed$33,200$60,100See the solar section
Propane tank (500 gal) and lines$1,500$3,500Estimate
Total, off-grid package$50,200$103,100
Total, house + off-grid package, with 10% contingency$250,200$482,300

Materials take-off: the structure

Quantities to price at a lumber yard and concrete plant. Unit prices are typical 2026 ranges; check them locally.

MaterialQuantityUnit priceCost
Concrete, footings (20" × 12")10 cu yd$120 - $170$1,200 - $1,800
Concrete, 4" slab20 cu yd$120 - $170$2,400 - $3,400
Gravel under the slab, 4"27 tons$35 - $60$900 - $1,600
Rebar #4 (footings + slab grid)1,888 ft$0.80 - $1.20$1,500 - $2,300
6-mil vapor barrier + 2" edge foam1,536 sq ft$0.40 - $0.80$600 - $1,200
2x6 studs, 10 ft (outside walls, 16" apart)138$8 - $12$1,100 - $1,700
2x4 studs, 10 ft (inside walls)142$5 - $8$700 - $1,100
Plates, 16 ft boards61$14 - $22$900 - $1,300
Roof trusses, 32 ft span, 24" apart25$150 - $320$3,800 - $8,000
OSB 7/16", walls and roof119 sheets$16 - $28$1,900 - $3,300
Metal roof panels, trim, screws1,996 sq ft$2.50 - $4.50$5,000 - $9,000
Synthetic underlayment + house wrap3,436 sq ft$0.20 - $0.35$700 - $1,200
Wall insulation R-211,224 sq ft$0.80 - $1.30$1,000 - $1,600
Attic insulation R-49 (blown)1,536 sq ft$1.20 - $2$1,800 - $3,100
Drywall 4×12 sheets136$18 - $26$2,400 - $3,500
Windows9$400 - $900$3,600 - $8,100
Outside doors3$400 - $1,200$1,200 - $3,600
Siding1,480 sq ft$3 - $7$4,400 - $10,400
Total, structure materials$35,200 - $66,100
Paying for it: construction loans, USDA rural loans and Farm Credit lenders that finance rural and off-grid homes are on the Financing page, with links and who to call.

Builder's blueprint

A 5-sheet blueprint set (11 × 17 in) for this house to take to a builder, lumber yard or lender:

Blueprint sheet A-1 for this plan

Download the blueprint set (PDF)

For planning, pricing and talking with builders. A licensed designer or engineer must review and stamp drawings for your site before construction.

Want a plan made for your land and family?

Tell us the bedrooms, baths, size and land you have. For $100 we draw your own plan in this same format: floor plan, site plan, cross-section, water, septic, solar and a full cost estimate with materials list.

Custom plans: opening soon How it works

Sources

Line items marked "Estimate" are House Critical estimates from typical 2026 prices. Get local quotes before you commit.